Sun Jan 05 18:07:25 UTC 2025: ## Chennai Metro Construction Causes Traffic Chaos at St. Thomas Mount

**Chennai, January 5, 2025** – Construction of the Chennai Metro Rail Phase II (Corridor 5) is causing significant traffic congestion on Paul Wells Road near St. Thomas Mount, exacerbating an already problematic area. The construction, which has reduced the road’s width by almost half, is creating massive traffic jams throughout the day.

The intersection of Paul Wells Road with Butt Road and Police Officers Road, already known for peak-hour congestion, is now severely impacted. The limited space allows only a few two-wheelers to pass at a time, leading to gridlock. The situation is particularly challenging during the morning rush hour, when heavy machinery used in the Metro construction further restricts traffic flow.

Commuters like C. Ashok, an IT professional, report daily headaches navigating the area. He and his colleagues face significant delays, particularly those working early morning shifts. The lack of adequate traffic management, with only a single construction worker directing traffic, further contributes to the problem.

The construction is not only causing traffic issues but also creating a significant dust problem, impacting the health of motorists and pedestrians alike. Residents are expressing frustration with the lack of effective traffic control and the inconvenience caused by the prolonged construction. While the Chennai Metro Rail Limited promises a “better tomorrow,” the current situation on Paul Wells Road presents a significant challenge for commuters.

Read More