Mon Nov 17 21:14:00 UTC 2025: Summary:
A major disruption of Compressed Natural Gas (CNG) supply affected vehicles across the Mumbai Metropolitan Region (MMR) on Monday, November 17, 2025. The disruption was caused by damage to GAIL’s main gas pipeline at the RCF premises in Trombay, which also impacted the gas supply at MGL’s City Gate Station (CGS) in Wadala since Sunday, November 16, 2025. As a result, a significant number of CNG stations (164 out of 389) in Mumbai, Thane, and Navi Mumbai were rendered inoperable. Mahanagar Gas Limited (MGL) prioritized supply to domestic Piped Natural Gas consumers and anticipates restoring full gas supply by November 18, 2025, after the pipeline is repaired.
News Article:
Mumbai CNG Supply Disrupted After Pipeline Damage; Restoration Expected Today
Mumbai, November 18, 2025 – A major disruption in the supply of Compressed Natural Gas (CNG) impacted commuters across the Mumbai Metropolitan Region (MMR) yesterday, November 17, 2025. The outage was triggered by damage to GAIL’s primary gas pipeline at the RCF premises in Trombay.
The incident also affected gas supply to Mahanagar Gas Limited’s (MGL) City Gate Station (CGS) in Wadala starting Sunday, November 16, 2025, further compounding the issue. MGL confirmed that out of the total 389 CNG stations in the region, 164 stations were temporarily non-operational due to the shortage.
“MGL is prioritizing uninterrupted gas supply to our domestic Piped Natural Gas consumers,” stated an MGL spokesperson. “However, due to the disruption at CGS Wadala, a number of CNG stations in Mumbai, Thane, and Navi Mumbai have been affected.”
Repair work on the damaged pipeline is underway, and MGL anticipates restoring full CNG supply across the network by today, November 18, 2025. Commuters are advised to check the operational status of their local CNG station before traveling.