
Tue Oct 07 13:12:57 UTC 2025: Here’s a summary and news article based on the provided text:
**Summary:**
The Water Resources Department (WRD) in Tiruchi, India, has announced plans to construct a flood protection wall along the Kuvalai drain in the Kattur area to prevent flooding in residential colonies like Balaji Nagar. The area has experienced recurring inundation during monsoons due to overflow from the drain, which carries water from various sources. The project, costing ₹8.22 crore, aims to build a 500-meter concrete wall and raise the bund height, with completion expected in 18 months. Additionally, the WRD will undertake flood mitigation efforts on the Koozhaiyar and Arattan Drains and rehabilitate the Kaduvai Drain’s inspection bridge-cum-regulator.
**News Article:**
**Tiruchi Residents to Get Flood Relief: Protection Wall Planned for Kuvalai Drain**
**TIRUCHI, INDIA – October 7, 2025** – Relief is on the horizon for residents of the Kattur area in Tiruchi, who have faced repeated flooding during the monsoon season. The Water Resources Department (WRD) has announced a major project to construct a flood protection wall along the Kuvalai drain, which has been overflowing and inundating residential colonies, particularly the densely populated Balaji Nagar.
The project, prompted by persistent appeals from residents, including representations to School Education Minister Anbil Mahesh Poyyamozhi, aims to address the long-standing issue. The Kuvalai drain, which carries floodwater from the Uyyakondan canal and jungle streams like the Upparu, has been a source of concern since 2005.
“Even in 2021, we faced the problem,” said K. Rajendran, a resident of Balaji Nagar. “The move to build a flood protection wall is welcome.”
The WRD plans to construct a concrete flood protection wall spanning approximately 500 meters along the left bank of the Kuvalai drain. The project, sanctioned at an estimated cost of ₹8.22 crore, also includes raising the height of the drain’s bund. Tenders have already been floated, and the department anticipates completing the work within 18 months of commencement.
Beyond the Kuvalai drain project, the WRD will also be undertaking flood mitigation works on the scoured portions of the Koozhaiyar Drain in Poovalur and the Arattan Drain at Siruthaiyur in Lalgudi taluk, areas that have reported flooding in recent years. This initiative will cost ₹9.81 crore. The inspection bridge-cum-regulator across the Kaduvai Drain connecting the Kollidam left bank in Anbil, Lalgudi taluk, will also be rehabilitated at a cost of ₹10.11 crore.
These initiatives reflect the WRD’s commitment to safeguarding communities from the devastating impacts of flooding and ensuring the safe management of water resources in the region.