Sun May 18 02:20:00 UTC 2025: Okay, here’s a news article based on the provided text:
**Headline: Indian Space Mission Fails After Anomaly Detected in Third Stage**
**Sriharikota, India – May 18, 2025** – The Indian Space Research Organisation (ISRO) experienced a setback today during the attempted launch of its EOS-09 Earth Observation Satellite aboard the PSLV-C61 rocket. The launch, marking ISRO’s 101st mission, commenced at 05:59 AM IST from the Satish Dhawan Space Centre, SHAR, with the Polar Satellite Launch Vehicle (PSLV) performing nominally through the second stage.
However, an anomaly was detected during the third stage of the launch, preventing the mission from achieving its intended objective of placing the EOS-09 into a Sun Synchronous Polar Orbit (SSPO). ISRO has not yet released specific details regarding the nature of the anomaly, but an investigation is likely underway.
The PSLV-C61 was the 63rd flight of the Polar Satellite Launch Vehicle and the 27th using the PSLV-XL configuration. The mission was intended to continue the PSLV’s record of reliable performance.
The EOS-09 satellite was designed to provide continuous and reliable remote sensing data for operational applications across various sectors. The mission also planned to utilize Orbit Change Thrusters (OCT) to reduce the altitude of the PS4 stage after satellite deployment, followed by passivation to limit its orbital life in line with responsible space operations guidelines. The failure of the mission is a disappointment for the Indian space program. ISRO is expected to release a more detailed statement pending the results of the investigation.