
Mon Oct 13 03:53:24 UTC 2025: **NEWS ARTICLE:**
**Bengaluru: Promised Pedestrian Bridge Near Challaghatta Metro Station Remains Unbuilt, Endangering Commuters**
**Bengaluru, October 13, 2025** – Despite being announced nearly a year ago, the pedestrian bridge proposed by the Bangalore Metro Rail Corporation Limited (BMRCL) near Challaghatta metro station remains unbuilt, forcing commuters and pedestrians to cross the busy Bengaluru-Mysuru National Highway amid fast-moving traffic. The delay has raised safety concerns among local residents, students, and daily metro users.
In April 2024, BMRCL unveiled plans to construct a pedestrian bridge across the highway to ease movement between the two sides and ensure safer access to the metro station. The project, which was expected to be completed by September 2024, was intended to serve as a critical link for thousands of people who use the Challaghatta metro station every day, with a ridership of nearly 10,000 passengers. However, there has been no progress on the ground, leaving commuters to navigate the perilous stretch without a safe crossing point.
The proposed bridge is especially crucial for students from several educational institutions located nearby, including Rajarajeshwari Medical College, ACS College of Engineering, Rajarajeshwari Dental College, SDM Institute of Ayurveda and Hospital, and ICFAI Business School.
“It’s very dangerous to cross the highway near the station,” said Prakash Kumar, a long-time resident of Challaghatta. “Vehicles move at very high speeds, and there’s no signal or safe point for pedestrians. Every day, I see people running across the road, narrowly escaping accidents. It’s shocking that a bridge promised months ago has still not been built.”
Students have also voiced frustration over the delay. “Crossing the highway has become a daily struggle,” said Aman Prasad, an engineering student. “There’s heavy traffic at all times…A pedestrian bridge or a skywalk would make a huge difference.”
“During peak hours, it’s chaotic,” added Pavitra Suresh, another student. “Vehicles don’t stop for pedestrians, and the service road is congested. Having a pedestrian bridge would make it much easier and safer for us to reach the metro station.”
Earlier, BMRCL officials had stated that a 100-metre-long footpath would be built along with the bridge to connect the structure directly to the entry point of the metro station. However, there has been no update from the authority on the status of the project.
When contacted, BMRCL officials did not explain the delay or the revised timeline even as commuters continue to risk their lives while crossing the highway with the hope that the long-promised bridge will become a reality before a serious accident occurs.
**SUMMARY:**
A pedestrian bridge near the Challaghatta metro station in Bengaluru, promised by BMRCL in April 2024 with an expected completion date of September 2024, remains unbuilt. This forces thousands of daily commuters, including students from nearby educational institutions, to risk crossing a busy highway without a safe crossing point. Local residents and students are expressing concerns about the dangerous situation and are demanding that BMRCL provide updates and complete the project before accidents occur. Despite repeated attempts for answers, BMRCL officials have not explained the delay.