Fri Sep 12 16:48:28 UTC 2025: Okay, here’s a news article based on the provided text, along with a brief summary of the context:

**Summary:**

The Indian Railways is facing a critical safety challenge. Rapid infrastructure development, including safety enhancements like new signalling systems and high-speed rail preparations, is leading to frequent cable cuts and signal failures. The Ministry of Railways has issued an urgent alert to zonal managers, emphasizing the need for stringent precautions and coordination to prevent potentially catastrophic accidents. This comes after a series of serious incidents linked to signal malfunctions, including a devastating collision in Balasore, Odisha. While the Railways invests heavily in safety measures like the indigenous Kavach system, the cable cut issue highlights a significant gap in implementation and oversight.

**News Article:**

**Indian Railways on High Alert as Cable Cuts Threaten Safety Amidst Infrastructure Push**

**CHENNAI, September 12, 2025** – The Indian Railways is grappling with a serious safety concern stemming from frequent signal failures caused by cable damage during ongoing infrastructure projects. The Ministry of Railways has issued an urgent alert to general managers of all Zonal Railways, calling for immediate and heightened precautionary measures.

The alert underscores that while the Railways is aggressively pursuing development and safety enhancement projects, including the implementation of automatic block signalling, double-lining, boundary wall construction for high-speed rail, and installation of the indigenous Kavach automatic train protection system, these very projects are inadvertently creating new risks.

“Such repeated signal failures due to cable cut/damage pose a serious threat to the safety and reliability of train services, and could lead to catastrophic consequences if adequate precautions are not taken,” the Ministry warned in its alert.

The issue of cable cuts triggering signal malfunctions is particularly alarming given the backdrop of recent serious accidents, including the devastating multiple-train collision in Balasore, Odisha, which resulted in nearly 300 fatalities and hundreds of injuries. Investigations into that incident pointed to signal failure as a contributing factor.

While the Railways reiterated existing Standard Operating Procedures and emphasized the importance of departmental coordination, a senior Railway officer noted that heavy penalties, up to ₹1 lakh per incident, are being levied on contractors responsible for cable damage. He stated, “Cable cut/damage will not happen if the work is executed strictly as per the drawing and under close monitoring of supervisory officials.”

The Railways invests over ₹1 lakh crore annually in safety-related activities, including the Kavach system, which is designed to assist loco pilots in maintaining safe speeds, even in low-visibility conditions. The system provides pilots with real-time information on a dashboard inside the train cab, reducing reliance on external visual signals.

Despite these investments, the persistent problem of cable cuts highlights the need for stricter oversight and improved execution during infrastructure development to ensure that these safety measures are not undermined by preventable errors. The Ministry’s alert signals a renewed focus on mitigating this critical risk and safeguarding the lives of passengers.

Read More