Mon Jun 23 07:50:54 UTC 2025: Here’s a summary and a news article based on the provided text:

**Summary:**

Road repair work has begun on the Kollegal taluk to Kargekandi stretch (Tamil Nadu-Karnataka border), forcing a ban on heavy vehicles using the Bargur Hills route between Tamil Nadu and Karnataka from June 22nd to July 5th, 2025. This has frustrated lorry drivers due to the short notice and the high cost and inconvenience of alternative routes. The road’s poor condition has been an ongoing issue.

**News Article:**

**Karnataka-Tamil Nadu Border Traffic Disrupted by Road Repairs; Lorry Drivers Express Frustration**

**ERODE, June 23, 2025** – Heavy vehicles are now banned from using the key inter-state route through Bargur Hills, connecting Tamil Nadu and Karnataka, due to urgent road repair work. The ban, which began on Sunday, June 22nd, at 6 PM, will remain in effect until July 5th, 2025.

The Kollegal taluk to Kargekandi stretch of the road, a vital link for goods transportation, has been in disrepair for an extended period, prompting the Karnataka government to initiate the long-awaited repairs. Erode District Collector Raja Gopal Sunkara has been instructed to restrict heavy vehicles with more than six wheels from using the route.

Traffic police at the Chellapampalayam check-post are diverting lorry drivers, advising them to take alternative routes to reach their destinations in Karnataka. However, the sudden implementation of the ban has triggered frustration among drivers.

One lorry driver, speaking anonymously, stated that the last-minute notification was creating significant hardship. “Consignments had already been booked, and now we’re faced with much longer and more expensive routes,” he said. He cited the high toll charges and increased distances associated with alternative routes like Dhimbam Road or the Mettur-Krishnagiri-Hosur highway as major drawbacks.

The driver also expressed concern about the condition of the road, saying, “This road has been terrible for years. The damage to our vehicles and the time wasted has been immense. These repairs are necessary, but they should have been undertaken much sooner.”

The road closure is expected to cause delays and potentially increase transportation costs for goods moving between Tamil Nadu and Karnataka during the repair period.

Read More