
Sun Sep 08 06:47:06 UTC 2024: – Carbon Capture, Utilization, and Storage (CCUS) technologies involve capturing CO2 from emissions sources for later use, transportation, or storage.
– The CCUS market is forecasted to grow from US$4.89 billion in 2024 to US$8.04 billion in 2030 at a CAGR of 8.7%.
– North America leads the CCUS market with large-scale projects in oil & gas facilities, while Europe is expected to see the fastest growth.
– Oil & gas, chemical, steel, and cement industries are integrating CCUS technologies.
– Key players investing in CCUS technology include Shell, BP, Honeywell, and Air Liquide.
– Adoption of CCUS is limited by costs and implementation lead times, but innovation and investment are expected to drive growth.
– Current levels of CCUS adoption are short of what is needed for net-zero targets.
– ABI Research’s report provides detailed market data and insights on the CCUS market.
Carbon Capture, Utilization, and Storage Market to Reach US$8.04 Billion in 2030, Yet Growth Still Limited by High Costs and Long Lead Times
Carbon Capture, Utilization, and Storage Market to Reach US$8.04 Billion in 2030, Yet Growth Still Limited by High Costs and Long Lead Times